You are here: ASAP > Discussion > VOR/DME criteria in Pans-Ops

Quick links
ImageIFR Procedure Design Services
ImageList of all ASAP s.r.o. Services
ImageGPS / GNSS Procedures Design
ImageInternational forum for discussion and information concerning IFR procedure design.
ImagePHX Software for Aeronautical Charting and IFR Procedure Design

VOR/DME criteria in Pans-Ops

06.10.2010

Submission:


For the VOR/DME criteria. Using the calculation parameters in Pans-Ops (Part III-Section 1, Chapter 4, paragraph 4.6) I sort of managed to get the results to match the Tables. By "sort of" I mean that I have to swap D2 with D1 to get the correct values for ATT to match the tables in Pans-ops. For example:

D1 = 30
D2 = 60
XTT = 5.4 NM (matches table)
1/2AW = 10.1 NM (matches table)
ATT = 2.6 NM (does not match table),

When I swap the D1 & D2 values in the calculation and re-calculate the ATT value I get 4.8 NM which does match the original value in the table entries that correspond to the original D1 & D2 values.

So my question is, which is correct the text or the tables

Peter Kelec – ASAP – Slovakia

.

Do you want comment this article or ask something?
Fill the submission form »

« back to Discussion page