You are here: ASAP > Discussion > Pans-Ops vs Eurocontrol 2

Quick links
ImageIFR Procedure Design Services
ImageList of all ASAP s.r.o. Services
ImageGPS / GNSS Procedures Design
ImageInternational forum for discussion and information concerning IFR procedure design.
ImagePHX Software for Aeronautical Charting and IFR Procedure Design

Pans-Ops vs Eurocontrol 2

02.09.2011

Submission:

The EUROCONTROL Guidance Material was originally written to provide clarification of the then limited RNAV design guidance in PANS-OPS. Since then we have worked hard to improve PANS-OPS, using much of the material from the EUROCONTROL document, but we have yet to get the EUROCONTROL Guidance Material updated.

Jeremy Davidson - Davidson Ltd - UK

Do you want comment this article or ask something?
Fill the submission form »

« back to Discussion page