You are here: ASAP > Discussion > CRM results ?

Quick links
ImageIFR Procedure Design Services
ImageList of all ASAP s.r.o. Services
ImageGPS / GNSS Procedures Design
ImageInternational forum for discussion and information concerning IFR procedure design.
ImagePHX Software for Aeronautical Charting and IFR Procedure Design

CRM results ?

20.06.2007

Submission:

Has anyone seen these types of results from the ILS CRM? The lower the OCA the lower the risk??  What do I do in this situation?  Prohibit a missed approach before OCA?

------------------------------------------------------------------------------

PRELIMINARY RESULTS FOR ILS CATEGORY I

 

SPEED

TYPE OF REPORT

OCA/H

TOTAL

HIGHEST RISK OBSTACLE

CAT.

 

 

METRES  

RISK     

IDENT   

DESCRIPTION   

RISK

A  

SPECIFIED   

OCA   

120  

1.5E-08 

A         

SPOT_HEIGHT   

9.8E-09

A  

MINIMUM     

OCA    

71  

9.9E-08 

A         

TREE          

8.9E-08

A  

HIGHER      

OCA   

286  

3.4E-06 

A         

TREE          

2.4E-06

A  

HIGHEST     

OCA   

304  

2.8E-06 

A         

ROCK          

1.7E-06

B  

SPECIFIED   

OCA   

120  

1.5E-08 

A         

SPOT_HEIGHT   

9.8E-09

B  

MINIMUM     

OCA    

75  

9.3E-08 

A         

TREE          

8.0E-08

B  

HIGHER      

OCA   

285  

3.7E-06 

A         

TREE          

2.4E-06

B  

HIGHEST     

OCA   

304  

3.2E-06 

A         

TREE          

1.9E-06

C  

SPECIFIED   

OCA   

120  

1.6E-08 

A         

TREE          

1.1E-08

C  

MINIMUM     

OCA    

80  

7.1E-08 

A         

TREE          

5.7E-08

C  

HIGHER      

OCA   

290  

3.9E-06 

A         

TREE          

2.7E-06

C  

HIGHEST     

OCA   

304  

3.7E-06 

A         

TREE          

2.5E-06

D  

SPECIFIED   

OCA   

120  

1.6E-08 

A         

TREE          

1.2E-08

D  

MINIMUM     

OCA    

84  

8.7E-08 

A         

TREE          

6.6E-08

D  

HIGHER      

OCA   

294  

4.3E-06 

A         

TREE          

2.9E-06

D  

HIGHEST     

OCA   

304  

4.1E-06 

A         

TREE          

3.0E-06

-------------------------------------------------------------------------------

Someone mentioned that I should just take the highest value but I disagree. The higher one does not meet the 1E-07 requirements, whereas the lower ones actually do.

Herman Groenewald

IATA-Africa Manager

Safety Operations & Infrastructure

Do you want comment this article or ask something?
Fill the submission form »

« back to Discussion page